How should the floor subsidence affect the delivery?

Comments · 2 Views

soil grouting https://en.hengxianghongye.com/Soil-Stabilisation.html

The factory building that has just been built and has not been delivered may cause uneven ground settlement due to backfill settlement, geological investigation errors, and construction standards that are not strictly implemented. The settlement of the plant workshop, is unable to pass the acceptance. So if this problem arises, how to solve it? Plant and workshop soil grouting affect the delivery of how to do, let's understand.

The soil grouting of the workshop affects the delivery. Under normal circumstances, everyone will not choose to dismantle the ground and redo it, which will affect the construction progress and cannot be delivered on time. In most cases, it will choose to consolidate and repair the settled ground, and as long as the corresponding flatness requirements are met, it can be delivered on time. The most common treatment methods include piling reinforcement method, grouting reinforcement method, local re-pouring method, etc. Each of these methods has its advantages and disadvantages. However, from the perspective of Party A, it must want to solve the settlement problem perfectly as soon as possible.

The "trenchless repair technology" independently developed by our company can quickly and efficiently (12 days can repair 1000 square meters) deeply solve the soil grouting problems of the plant and workshop, which not only takes short time and low cost, but also does not break the ground and does not affect the project progress, and the technology has 20-year quality guarantee.

soil grouting https://en.hengxianghongye.com/Soil-Stabilisation.html

Comments